Trail Images

 

Phase One: Black Bridge Connector. Completed June 2017

1 mile of paved trail connecting from Kelly Dr., over the Black Covered Bridge, to Bonham rd.

There, the paved path connects to a 1.25 mile crushed stone trail that connects  to the DeWitt Log House and SR 73.

Oxford-Area-Trail-Map

 

 Phase Two: Miami Connector (Will begin in 2019)

Will create a 1.35 mile trail  connecting SR 73 at DeWitt Log House parking lot over to St. Rt 27 at Peffer Park.

Map for Fall 2016 newsletter

 

Phase Three: Talawanda High School Connector: (Will begin in 2021) 

This section will create a paved path from Talawanda High School to Peffer Park.

It will also pave the crushed stone section near DeWitt Log House off of sR 73 and create a trail access point near the Miami Art Museum.

2017 Trail Map with phases

 

 

Entire Proposed Path and Key Connector Points:

2014 Bike Ped Safety Plan 2008 Comp Plan Amendment Map